NO.DESCRIPTIONVALUE (RM)OWNER/MAIN CONSTRUCTORPERIOD
1Firewater Line Works
Underground and Aboveground Fire Water Line Ductile Iron Pipe
700,000.00Toyo Engineering & Construction Sdn Bhd2019
2Rapid SCC Project
Civil Work for Tank Farm 5210-T-101A/B
1,050,000.00TTCL Malaysia Sdn Bhd2018 – 2019
3Rapid SCC Project
Civil Work for Tank Farm 5210-T-105A/B
1,900,000.00TTCL Malaysia Sdn Bhd2018 – 2019
4Eastman Copo
Polymer Plant Piping, Mechanical, Civil & Structure for Polymer Plant Section Expansion
1,200,000.00Toyo Engineering & Construction Sdn Bhd2018
5Rapid SCC Project
Civil Work for All Remaining Offsite Area and Punch List for Other Manpower Supply for Piping for Remaining Work
5,000,000.00Toyo Engineering & Construction Sdn Bhd2018
6Rapid SCC Project
Manpower Supply for Aboveground Piping work
(Additional Work)
9,500,000.00TTCL Malaysia Sdn Bhd2017 – 2018
7Rapid SCC Project
Manpower Supply for Piping Underground and Others work
2,000,000.00TTCL Malaysia Sdn Bhd2017 – 2018
8Rapid SCC Project TXYA109

2 Basins and Trench Work
5,200,000.00TTCL Malaysia Sdn Bhd2017 – 2018
9Rapid SCC Project TXYA108

Civil Work for Slop Oil System (Tank Foundation, Bundwall, Piperack & HPPE)
2,900,000.00TTCL Malaysia Sdn Bhd2017 – 2018
10RAPID Package 4

Civil Work For Paving
3,200,000.00Petrofac E&C Sdn Bhd2017 – 2018
11RAPID Package 4

Civil Work For Underground Pit
24,000,000.00Petrofac E&C Sdn Bhd2016 – 2018
12Provisional Work For RAPID P5 CNIEC
Temporary Office and Laydown
1,250,000.00CNIEC Sdn Bhd2016 
to 
2017
13RAPID Steam Cracker Complex (SCC)
Temporary Facilities (Warehouse & Canteen) – Engineering, Procurement, Construction & Commissioning
2,200,000.00TTCL Malaysia Sdn Bhd2015 to 2016
14Idemitsu SM – ISM E305 Expansion Project
Piling, Civil & Steel Structure Works
1,200,000.00Toyo Engineering And Construction Sdn Bhd2015 to 2016
15Activated Carbon Filter (Piping)
Mechanical Installation, Piping & Insulation Works
4,000,000.00Toyo Engineering And Construction Sdn Bhd2015 to 2016
16Activated Carbon Filter (Civil)
Civil Foundation & Drainage
960,000.00Toyo Engineering And Construction Sdn Bhd2015
17BASF Acid Plant 2AH
Perimeter Hoarding & Boom Gate 2 Temporary Facilities
150,000.00Muhibbah Engineering Berhad2015
18BASF Lemongrass
Supply of Manpower for Anchor Bolt Installation & Civil Works
200,000.00Muhibbah Engineering Berhad2015
19PRR4 Project

Provision To Carry Out Civil Work For Revamp And Rejuvenation Of GPP4
9,600,000.00Petronas Gas Berhad/ 
Toyo Engineering And Construction Sdn Bhd2014
20TGAST
Provision To Carry Out Civil Work For Pipe Support
750,000.00Petronas Carigali/ 
Algotech Malaysia Sdn Bhd2014
21HA MBD Project
Provision Supply Of Manpower, Tools And Materials To Carry Out Aluminium Window And Door Work
300,000.00Messier Bugatti Dowty Malaysia Sdn Bhd / 
Algotech Malaysia Sdn Bhd2013 to 
2014
22HA MBD Project
Provision Supply Of Manpower, Tools And Materials To Carry Out Civil Works & Building Works
1,200,000.00Messier Bugatti Dowty Malaysia Sdn Bhd / 
Algotech Malaysia Sdn Bhd2013 to 2014
23Arkema

Lychee Project-Provision Supply Of Manpower, Tools And Materials To Carry Out Civil Works & Building Works
7,500,000.00Arkema Theochemicals Sdn Bhd / Foster Wheeler Sdn Bhd2013 to 2014