NO. | DESCRIPTION | VALUE (RM) | OWNER/MAIN CONSTRUCTOR | PERIOD |
---|---|---|---|---|
1 | GMP Blending Facility Brant Project Piping, Piling, Civil, Structure, Mechanical and Preliminary Works | 8,400,000.00 | Toyo Engineering & Construction Sdn Bhd | 2020 to Present |
2 | MTBE Flare Improvement Project Civil Work, Fire Proofing and Far Building Architectural Works | 6,600,000.00 | Kejuruteraan QKS Sdn Bhd | 2019 to 2020 |
3 | Polyplastic Water System Improvement Project Piling, Civil and Roadwork | 400,000.00 | Toyo Engineering & Construction Sdn Bhd | 2019 to 2020 |
4 | Scalper Modification Project Supply Manpower, Material, Machinery, Erection Works | 430,000.00 | Toyo Engineering & Construction Sdn Bhd | 2019 to 2020 |
5 | Water Reservoir Project Supply Manpower, Material, Machinery, Civil, Structure and Piping Works | 2,300,000.00 | Toyo Engineering & Construction Sdn Bhd | 2019 |
6 | Firewater Line Works Underground and Aboveground Fire Water Line Ductile Iron Pipe | 700,000.00 | Toyo Engineering & Construction Sdn Bhd | 2019 |
7 | Rapid SCC Project Civil Work for Tank Farm 5210-T-101A/B | 1,050,000.00 | TTCL Malaysia Sdn Bhd | 2018 to 2019 |
8 | Rapid SCC Project Civil Work for Tank Farm 5210-T-105A/B | 1,900,000.00 | TTCL Malaysia Sdn Bhd | 2018 to 2019 |
9 | Eastman Copo Polymer Plant Piping, Mechanical, Civil & Structure for Polymer Plant Section Expansion | 1,200,000.00 | Toyo Engineering & Construction Sdn Bhd | 2018 |
10 | Rapid SCC Project Civil Work for All Remaining Offsite Area and Punch List for Other Manpower Supply for Piping for Remaining Work | 5,000,000.00 | Toyo Engineering & Construction Sdn Bhd | 2018 |
11 | Rapid SCC Project Manpower Supply for Aboveground Piping work (Additional Work) | 9,500,000.00 | TTCL Malaysia Sdn Bhd | 2017 to 2018 |
12 | Rapid SCC Project Manpower Supply for Piping Underground and Others work | 2,000,000.00 | TTCL Malaysia Sdn Bhd | 2017 to 2018 |
13 | Rapid SCC Project TXYA109
2 Basins and Trench Work | 5,200,000.00 | TTCL Malaysia Sdn Bhd | 2017 to 2018 |
14 | Rapid SCC Project TXYA108
Civil Work for Slop Oil System (Tank Foundation, Bundwall, Piperack & HPPE) | 2,900,000.00 | TTCL Malaysia Sdn Bhd | 2017 to 2018 |
15 | RAPID Package 4
Civil Work For Paving | 3,200,000.00 | Petrofac E&C Sdn Bhd | 2017 to 2018 |
16 | RAPID Package 4
Civil Work For Underground Pit | 24,000,000.00 | Petrofac E&C Sdn Bhd | 2016 to 2018 |
17 | Provisional Work For RAPID P5 CNIEC Temporary Office and Laydown | 1,250,000.00 | CNIEC Sdn Bhd | 2016 to 2017 |
18 | RAPID Steam Cracker Complex (SCC) Temporary Facilities (Warehouse & Canteen) – Engineering, Procurement, Construction & Commissioning | 2,200,000.00 | TTCL Malaysia Sdn Bhd | 2015 to 2016 |
19 | Idemitsu SM – ISM E305 Expansion Project Piling, Civil & Steel Structure Works | 1,200,000.00 | Toyo Engineering And Construction Sdn Bhd | 2015 to 2016 |
20 | Activated Carbon Filter (Piping) Mechanical Installation, Piping & Insulation Works | 4,000,000.00 | Toyo Engineering And Construction Sdn Bhd | 2015 to 2016 |
21 | Activated Carbon Filter (Civil) Civil Foundation & Drainage | 960,000.00 | Toyo Engineering And Construction Sdn Bhd | 2015 |
22 | BASF Acid Plant 2AH Perimeter Hoarding & Boom Gate 2 Temporary Facilities | 150,000.00 | Muhibbah Engineering Berhad | 2015 |
23 | BASF Lemongrass Supply of Manpower for Anchor Bolt Installation & Civil Works | 200,000.00 | Muhibbah Engineering Berhad | 2015 |
24 | PRR4 Project
Provision To Carry Out Civil Work For Revamp And Rejuvenation Of GPP4 | 9,600,000.00 | Petronas Gas Berhad/ Toyo Engineering And Construction Sdn Bhd | 2014 |
25 | TGAST Provision To Carry Out Civil Work For Pipe Support | 750,000.00 | Petronas Carigali/ Algotech Malaysia Sdn Bhd | 2014 |
26 | HA MBD Project Provision Supply Of Manpower, Tools And Materials To Carry Out Aluminium Window And Door Work | 300,000.00 | Messier Bugatti Dowty Malaysia Sdn Bhd / Algotech Malaysia Sdn Bhd | 2013 to 2014 |
27 | HA MBD Project Provision Supply Of Manpower, Tools And Materials To Carry Out Civil Works & Building Works | 1,200,000.00 | Messier Bugatti Dowty Malaysia Sdn Bhd / Algotech Malaysia Sdn Bhd | 2013 to 2014 |
28 | Arkema
Lychee Project-Provision Supply Of Manpower, Tools And Materials To Carry Out Civil Works & Building Works | 7,500,000.00 | Arkema Theochemicals Sdn Bhd / Foster Wheeler Sdn Bhd | 2013 to 2014 |